LARGE SCALE USE OF PREFABRICATED ELEMENTS IN THE CONSTRUCTION OF BRIDGES ON THE BELGRADE-NIS MOTORWAY, SECTION POJATE-DELIGRAD
MASOVNA PRIMENA MONTAZNE GRADNJE MOSTOVA NA AUTO-PUTU BEOGRAD-NIS DEONICA POJATE-DELIGRAD
In the paper the design process which develops from an idea to the successful realization of projects and structures has been briefly presented. 13 bridges were constructed in total with 6 of them as double structures over a length of 1472 metres. The longest is 265 metres long and the width of bridges follow the pavement width and ranges from 11.35 to 13.35 metres. The bridges have been constructed at the most difficult part of the alignment in such a way that longer bridges have been constructed in circular and transition curves with different gradients. Prefabricated concrete beams with 25 metre spans and unified medium beams have been used while the bridge deck has been cast in situ. In the calculation of static loads, the longitudinal girders have been considered with respect to their proper weight as a statically determined line system. The system has been considered as a beam-and-stringer grid for a live load. The construction was efficiently completed in a year. (TRRL)
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/03506355
-
Corporate Authors:
Institut za Puteve
Kumodraska 257
Belgrade, Yugoslavia -
Authors:
- Kostic, V
- Zivkovic, P
- Andjelic, A
- Publication Date: 1980
Language
- Serbian
Media Info
- Features: Figures; Tables;
- Pagination: p. 60-71
-
Serial:
- INSTITUT ZA PUTEVE
- Issue Number: 11
- Publisher: Institut za Puteve
- ISSN: 0350-6355
Subject/Index Terms
- TRT Terms: Beams; Bridge decks; Bridge design; Bridges; Cast in place concrete; Cast in place structures; Concrete; Construction management; Curved bridges; Design; Girders; Live loads; Precast concrete; Prefabricated structures; Static loads; Structural design; Transition curves
- Uncontrolled Terms: Concrete beams; Longitudinal
- Geographic Terms: Yugoslavia
- ITRD Terms: 3472: Beam; 4781: Cast in situ concrete; 3666: Construction method; 3438: Curved bridge; 9011: Design (overall design); 9039: Longitudinal; 3638: Prefabrication; 2892: Transition curve; 8128: Yugoslavia
- Subject Areas: Bridges and other structures; Construction; Design; Highways; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00368054
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Files: ITRD, TRIS
- Created Date: Nov 30 1982 12:00AM