MODERN TUNNELING METHODS SPEED MONTREAL METRO

The method described is to advance a tunnel section on two faces concurrently from a centrally located access shaft. Two gantry-type jumbo drills are used each equipped with five Tamrock hydraulic booms and drills.

  • Corporate Authors:

    Southam Business Publications Limited

    1450 Don Mills Road
    Don Mills, ONo,   Canada 
  • Publication Date: 1974-3

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00057435
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Nov 6 1981 12:00AM