TIMING CRITICAL IN BRIDGE RAISE
The project of raising a railroad bridge while the line is still in service at Lewiston, Idaho was broken into five stages of construction. In addition to the raising of the bridge 9 ft 3 in., specifications include construction of two 11 41-ft concrete bridge piers and foundation reinforcement of one existing pier; replacement of two bridge spans, including one new lift span; and construction of an 8-ft wide 200-ft long shipping guide wall. Keys to the project are self-contained jacks.
-
Corporate Authors:
Mercury Publications Limited
84 Isabel Street
Winnipeg 2, MB Canada - Publication Date: 1973-12
Media Info
-
Serial:
- Western Construction and Industry
- Volume: 48
- Issue Number: 12
- Publisher: Mercury Publications Limited
Subject/Index Terms
- TRT Terms: Bridges
- Subject Areas: Bridges and other structures; Railroads;
Filing Info
- Accession Number: 00056822
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Jul 31 1976 12:00AM