EVALUATION OF FREEWAY HIGH OCCUPANCY VEHICLE LANES AND RAMP METERING: VOLUME II. BIBLIOGRAPHY AND ABSTRACTS

Volume 2 of a two-volume study on freeway lanes for high occupancy vehicles (HOV) and freeway ramp metering contains Appendix A--Estimating Mode Shift; Appendix B--Bibliography; and Appendix C--Abstracts pertinent to ramp metering and HOV projects, concepts and planning procedures. The references are categorized according to the following outline: High Occupancy Vehicle Lanes: (a) Summary or General Reports, (b) Project Reports, (c) Planning Approaches, (d) Air Quality Aspects, (e) Energy Aspects; Ramp Metering and Ramp Meter Bypass Lanes: (a) Summary or General Reports, (b) Project Reports, (c) Planning Approaches.

  • Supplemental Notes:
    • See also PB82-161258, HS-030 905 and Volume 1, PB82-161266, HS-030 903. Also available in set of 3 reports PC E99, PB82-161241.
  • Corporate Authors:

    Baugh (D) and Associates, Incorporated

    141 Milk Street
    Boston, MA  United States  02109

    Wagner-McGee Associates

    4660 Kenmore Avenue, Suite 825
    Alexandria, VA  United States  22304

    SG Associates, Incorporated

    4200 Daniels Avenue
    Annandale, VA  United States  22003

    Asst Secretary for Policy & International Affairs

    400 7th Street, SW
    Washington, DC  United States  20590
  • Authors:
    • Spielberg, F
    • Zellner, C
    • Andrle, S
    • Tcheng, M
    • Wagner, F A
  • Publication Date: 1980-8

Media Info

  • Pagination: 142 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00364828
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: DOT-P-30-80-29, HS-030 904
  • Contract Numbers: DOT-OST-78-050
  • Files: HSL, NTIS, TRIS
  • Created Date: Apr 28 1983 12:00AM