CLOSING THE GAPS WITH ASSEMBLY LINE SPAN PLACEMENT

The paper reports on the span-by-span segmental construction of the record-length Seven Mile Bridge in the Florida Keys. Seven Mile features box webs that have multiple shear keys, joints that are not epoxied and stressing tensions exposed within the box. Also, the segments will have no wearing course. Traffic will move directly on top of the concrete surface.

  • Availability:
  • Corporate Authors:

    McGraw-Hill, Incorporated

    330 West 42nd Street
    New York, NY  United States  10036
  • Publication Date: 1981-9-3

Media Info

  • Pagination: p. 26-28
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00348282
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Jul 30 1982 12:00AM