FOOTBRIDGES AT MILTON KEYNES
A description is given of the design and in situ construction of two footbridges in reinforced concrete each with two post-tensioned cantilevered spans, independent of each other and joined by a special dowel joint. The spans are supported at the abutments and intermediate piers, and seated on laminated rubber bearings. The bridge decks are integral with the side walls which carry the prestressing cables. Details are included of the concrete used and post-tensioning procedure. Granite aggregate cladding panels are fitted and the external rendering is in resin bonded natural stone. (TRRL)
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/00105317
-
Corporate Authors:
Cement and Concrete Association
Wexham Spring
Slough SL3 6PL, Buckinghamshire, England -
Authors:
- Seymour, M
- Publication Date: 1980-2
Media Info
- Features: Figures; Photos; Tables;
- Pagination: p. 29-30
-
Serial:
- CONCRETE
- Volume: 14
- Issue Number: 2
- Publisher: THE CONCRETE SOCIETY
- ISSN: 0010-5317
Subject/Index Terms
- TRT Terms: Bridge abutments; Bridge decks; Bridge design; Bridge piers; Bridges; Cantilevers; Concrete; Construction management; Design; Field tests; Footbridges; Joints; New towns; Posttensioning; Prestressing; Reinforced concrete; Structural design
- Geographic Terms: United Kingdom
- Old TRIS Terms: Insitu methods
- ITRD Terms: 3450: Cantilever; 3666: Construction method; 9011: Design (overall design); 3475: Footbridge; 2998: Joint (structural); 329: New town; 4789: Post tensioning; 4777: Prestressing; 4794: Reinforced concrete; 8119: United Kingdom
- Subject Areas: Bridges and other structures; Construction; Design; Highways; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 00316907
- Record Type: Publication
- Source Agency: Transport Research Laboratory
- Files: ITRD, TRIS
- Created Date: Oct 27 1980 12:00AM