Review of Initial Project Estimates for Design, Right of Way, Utilities, and Construction
This report offers a review of the initial project estimates for design, right of way, utilities and construction used by eleven state departments of transportation. Chapter 1 provides a brief overview of the project cost estimating methodologies used in New Jersey, Washington, Montana, California, Connecticut, Indiana, Georgia, Illinois, Minnesota, Nevada and Utah. In chapter 2, various KYTC forms and policies are summarized to provide the most complete picture possible of how current processes function — from a broader project design and delivery overview — to pre-design activities.
- Record URL:
-
Corporate Authors:
University of Kentucky, Lexington
Kentucky Transportation Center
College of Engineering, 176 Raymond Building
Lexington, KY United States 40506-0281Kentucky Transportation Cabinet
State Office Building, 200 Mero Street
Frankfort, KY United States 40622 -
Authors:
- van Dyke, Christopher
- Gibson, Bryan
- Jasper, Jeff
- Kreis, Doug
- Publication Date: 2017-10
Language
- English
Media Info
- Media Type: Digital/other
- Features: Appendices; Figures; References; Tables;
- Pagination: 80p
Subject/Index Terms
- TRT Terms: Construction; Construction projects; Design; Estimates; Project delivery; Project management; Right of way (Land)
- Uncontrolled Terms: Project development; Utilities
- Geographic Terms: Kentucky
- Subject Areas: Construction; Highways; Planning and Forecasting;
Filing Info
- Accession Number: 01691590
- Record Type: Publication
- Report/Paper Numbers: KTC-TA-17-05/SPR17-545-1F
- Files: TRIS, ATRI, STATEDOT
- Created Date: Jan 28 2019 10:13AM