Repair of Reinforced Concrete Bridge Columns via Plastic Hinge Relocation, Volume 2: Repair Using CFRP Materials

The goal of this report is to present a repair procedure for seismically damaged reinforced concrete bridge columns via plastic hinge relocation. To repair the damaged columns, carbon fiber (CF) anchors were utilized. Thus, the behavior of CF anchors was studied through various testing methods and design procedures were developed. In addition, the reliability of the proposed design procedure was shown with large scale testing.

Language

  • English

Media Info

  • Media Type: Digital/other
  • Edition: Final Report
  • Features: Figures; Photos; References; Tables;
  • Pagination: 191p

Subject/Index Terms

Filing Info

  • Accession Number: 01690343
  • Record Type: Publication
  • Report/Paper Numbers: Report No. 4000(142)
  • Contract Numbers: Federal #: 4000(142); IRIS #: Z839740000
  • Files: TRIS, ATRI, USDOT, STATEDOT
  • Created Date: Dec 30 2018 6:15PM