Proposed Modification to AASHTO LRFD Bridge Design Specifications, Section 13—Railing

The language of "Section 13: Railing" in the AASHTO LRFD [Load and Resistance Factor Design] Bridge Design Specifications, published in 2007, has not had a major revision since LRFD specifications were adopted. Some of the text date back to the 1989 AASHTO Guide Specifications for Bridge Railings. Then, in 2009, MASH replaced the 1993 NCHRP Report 350: Recommended Procedures for the Safety Performance Evaluation of Highway Features for evaluating safety hardware devices. On January 7, 2016, the American Association of State Highway and Transportation Officials (AASHTO) and the Federal Highway Administration (FHWA) signed a joint implementation agreement requiring all new permanent installation and full replacement of bridge rails on the national highway system in contracts let after December 31, 2019, to be compliant with the AASHTO Manual for Assessing Safety Hardware (MASH). Therefore, there was an immediate need to update the bridge railing design requirements to incorporate MASH requirements and address outdated language and areas of ambiguity particularly related to loads, load distribution to bridge barriers and deck overhangs, railing geometry, and analysis methods for determining the demand and capacity of bridge barriers. Under NCHRP Project 22-41, "Proposed Modification to AASHTO LRFD Bridge Design Specifications, Section 13--Railing", Modjeski and Masters, Inc. was asked to (1) propose updates to bridge railing design requirements and (2) develop examples to demonstrate the application of the proposed updates. The research team suggested draft language for consideration by AASHTO in the next update of the LRFD Bridge Design Specifications and provided analysis and design examples to illustrate the proposed updates.

Language

  • English

Project

  • Funding: $230000
  • Contract Numbers:

    Project 22-41

  • Sponsor Organizations:

    National Cooperative Highway Research Program

    Transportation Research Board
    500 Fifth Street, NW
    Washington, DC  United States  20001

    Federal Highway Administration

    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590

    American Association of State Highway and Transportation Officials (AASHTO)

    444 North Capitol Street, NW
    Washington, DC  United States  20001
  • Project Managers:

    Abu-Hawash, Ahmad

  • Performing Organizations:

    Modjeski & Masters, Incorporated

    P.O. Box 2345
    Harrisburg, PA  United States  17105-
  • Principal Investigators:

    Holt, John

  • Start Date: 20190606
  • Expected Completion Date: 20230831
  • Actual Completion Date: 20230831

Subject/Index Terms

Filing Info

  • Accession Number: 01687624
  • Record Type: Research project
  • Source Agency: Transportation Research Board
  • Contract Numbers: Project 22-41
  • Files: TRB, RIP
  • Created Date: Dec 3 2018 3:30PM