POLING PILE HOOD PROTECTS BUILDING AGAINST SETTLEMENT

Protection against settlement of a 100-year-old building became necessary during the construction of an escalator tunnel for the Tyne and Wear rapid transit system in the U. K. The method selected, described in the article, involved the construction of a parabolic arch of poling piles over the escalator shaft to form a shield while tunnelling proceeded.

  • Availability:
  • Corporate Authors:

    Morgan-Grampian Limited

    30 Calderwood Street
    London SE18 6QH,   England 
  • Authors:
    • Tindle, A
  • Publication Date: 1979-11

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00312116
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Jul 22 1980 12:00AM