STANDARDISATION OF AIR-CONDITIONING AND HEATING INSTALLATIONS. AIR CONDITIONING SYSTEM FOR IMMEDIATE APPLICATION

The final aim of ORE Specialists Committee B 107 is to produce a specification for a standard air conditioning system for passenger coaches, which will incorporate the results of considerable experience and testing. As such a specification cannot be produced in less than four or five years, this interim report has been produced which recommends the heating, cooling and ventilation capacities, air distribution system and layout of equipment to be adopted as an intermediate part standardisation until the final specification for a standard system can be prepared.

  • Supplemental Notes:
    • Restrictions on the use of this document are contained in the explanatory material.
  • Corporate Authors:

    International Union of Railways

    Office of Research and Experiments
    Utrecht,   Netherlands 
  • Publication Date: 1972-4

Media Info

  • Features: Figures; Tables;
  • Pagination: 26 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00052987
  • Record Type: Publication
  • Source Agency: International Union of Railways
  • Report/Paper Numbers: B107/RP 2/E
  • Files: TRIS
  • Created Date: Oct 26 1976 12:00AM