MASSACHUSETTS ROADSIDE DEVELOPMENT RESEARCH 1978

Projects I through IV of the study "Roadside Development" were phased out by 1977. The results of these projects were summarized in Report #R5-5-2656-46 and in the Final Report #R5-5-2656-52, issued December, 1977. Project V (Artificial Loam) was not funded in C.Y. 1978, but sewage sludge, wood chips, fly ash and bottom ash were collected for preparation of artificial loams by composting. The evaluation of roadside plots from 1977 was submitted in August as Interim Report #53 "Basic Study of Artificial Loam (Supplement)". Project VI (Operation Wildflower) received main emphasis and is summarized. A. Literature search indicated only a few references on field culture or growth patterns specifically along roadsides. B. Natural communities of selected wildflower species along Massachusetts highways are sparse, especially spring blooming varieties. Summer and fall varieties are present, but not generally large enough for seed harvesting. C. Site studies are discouraged by contractural limitations on plant establishment, and cooperative agreement for site studies need to be included in landscape contracts. D. Sampling parameters are satisfactory but initial compaction tests are needed on each site to determine if germination and establishment is feasible without soil preparation. E. Seeds are available wholesale from two sources, Herbst Brothers, in Brewster, NY and Environmental Seed Producers in El Monte, CA. F. Direct seeding and hydroseeding of slopes appear to be best for establishment at least cost. G. Transplanting appears bets to guarantee establishment, but it is expensive due to cultural requirements and labor. H. Cost appraisals are not feasible at this time, but "per acre" fees can be calculated from current contracts. /FHWA/

  • Corporate Authors:

    University of Massachusetts, Amherst

    Department of Plant and Soil Sciences, French Hall
    Amherst, MA  United States  01003

    Massachusetts Department of Public Works

    Research and Materials Section, 99 Worcester Street
    Wellesley Hills, MA  United States  02181

    Federal Highway Administration

    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Authors:
    • Airhart, D L
    • Falls, K M
    • Barker, A V
    • Zak, J M
  • Publication Date: 1979-11

Media Info

  • Pagination: 3 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00308341
  • Record Type: Publication
  • Report/Paper Numbers: FHWA-MA-78-54 Final Rpt.
  • Contract Numbers: Mass 2656
  • Files: TRIS, USDOT