Strengthening of concrete bridge over the river Nossan: new pre-stressing method - evaluation and development

The aim of this project was to evaluate the innovative strengthening method (called here Chalmers/TENROC method) on the bridge over Nossan (Nossan at S. Härene church, bridge no. 15-376-1) with regard to practical production experience and sustainability, as well as, propose ideas for further development of the method. The scope of this project was to present: 1) planning, logistics and assembly of pre-stressed laminate on the bridge, 2) environmental impact and LCC analysis. 3) material usage and adaptation of laminates for pre-stressing work 4) safety conditions for conducting on-site woks before and during pre-stressing of the laminates on a concrete bridge.

Language

  • English

Media Info

  • Pagination: 47p

Subject/Index Terms

Filing Info

  • Accession Number: 01582189
  • Record Type: Publication
  • Source Agency: Swedish National Road and Transport Research Institute (VTI)
  • Files: ITRD, VTI
  • Created Date: Nov 25 2015 11:16AM