Container Yard Operation Analysis for a Container Terminal

This paper studied the key delays factor of container yard for a container terminal. It explored the key delays factor that affected the operating performance of container yard operation. Hence, a survey is conducted and analyzed by SPSS. Descriptive analysis, normality test and reliability test are used to analyze and display the result. The initial result showed that rubber tyred gantry crane, turning for 90⁰ and waiting for prime mover are often happening during the container yard operation. As a conclusion, the handling equipment is the main cause of the delays factor.