AS BR ANGLO-SCOTTISH ELECTRIFICATION REACHES PRESTON, SIGNALLING AND TRACTION MODERNISATION NEAR FRUITION
230 ac locomotives comprising 35 new 147 refurbished and 48 as-built units present a resourceful outcome of modern thinking, as does the establishing of only four control areas to operate over 400 route-miles fully covered by comprehensive telecommunication network, colour-light signalling, route-relay interlocking, computerized train reporting and describing, and hotbox-detection network.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/9675046
-
Corporate Authors:
Broadfields (Technical Publishers) Limited
Little Leighs
Chelmsford, Essex CMB 1PM, England - Publication Date: 1973-9
Media Info
- Features: Figures; Photos;
- Pagination: 4 p.
-
Serial:
- Rail Engineering International
- Volume: 3
- Issue Number: 7
- Publisher: De Rooi Publications
- ISSN: 0141-4615
Subject/Index Terms
- TRT Terms: Electric locomotives; Railroad electrification; Signaling
- Identifier Terms: British Rail
- Subject Areas: Construction; Railroads;
Filing Info
- Accession Number: 00048221
- Record Type: Publication
- Files: TRIS
- Created Date: Jan 4 1976 12:00AM