2011 MnROAD Mainline Concrete Construction: Cells 5, 6, and 63

In September 2011, Minneota Department of Transportation (MnDOT) constructed two cells in the MnROAD Mainline in continuation of the study of unbonded overlay (Cell 5) and to facilitate studies on a drainable base (Cell 6) with a longitudinal tined texture. Additionally, roller compacted concrete shoulders were constructed in these cells, to replace the preexisting asphalt shoulders. Finally, repairs were done to a thin concrete overlay of existing asphalt pavement installed in 2004 (Cell 63). This report discusses the construction procedure, instrumentation, and the initial monitoring from these test cells.

Language

  • English

Media Info

  • Media Type: Digital/other
  • Edition: Final Report
  • Features: Appendices; Figures; References; Tables;
  • Pagination: 96p

Subject/Index Terms

Filing Info

  • Accession Number: 01501562
  • Record Type: Publication
  • Report/Paper Numbers: MN/RC 2012-37
  • Files: TRIS, ATRI, STATEDOT
  • Created Date: Dec 23 2013 7:52AM