CUT-AND-COVER AND BORED TUNNEL CONSTRUCTION ADOPTED BY LONDON TRANSPORT'S TUBE RAILWAY EXTENSION LONDON AIRPORT
Secant-piling and rubber-supported track decking techniques applied for the two-mile residential area combined with box construction and concrete-lined tunnels within the airport perimeter to suite surface conditions on the 3-1/2-mile extension of Piccadilly Line.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/9675046
-
Corporate Authors:
Broadfields (Technical Publishers) Limited
Little Leighs
Chelmsford, Essex CMB 1PM, England - Publication Date: 1973-4
Media Info
- Pagination: 9 p.
-
Serial:
- Rail Engineering International
- Volume: 3
- Issue Number: 4
- Publisher: De Rooi Publications
- ISSN: 0141-4615
Subject/Index Terms
- TRT Terms: Airport access; Rapid transit; Tunneling; Tunnels
- Identifier Terms: London Transport
- Subject Areas: Aviation; Bridges and other structures; Construction; Public Transportation;
Filing Info
- Accession Number: 00046818
- Record Type: Publication
- Files: TRIS
- Created Date: Oct 18 1981 12:00AM