PROBLEMS OF LOADS DUE TO SEA SWELLS TRANSMITTED TO A FLOATING CRANE BY LOAD-LIFTING ROPES

K VOPROUS O NAGRUZKAKH OT VOLNENIYA, PEREDAVAENYKH NA PLAVUCHII KRAN CHEREZ GRUZOPOD'EMYE KANATY

Equations are derived which determine maximum loads transmitted to the load-lifting zones during the load pickup by a floating crane of the crane pontoon. The results obtained allow the determination of the most favorable initial conditions of the load pickup which can be obtained by the automatic control of the windlass and which preclude the overstressing of the ropes beyond the limits established for a smooth sea operation.

  • Authors:
    • Medvedik, S I
    • Chplygin, F T
  • Publication Date: 1972

Language

  • Russian

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00046612
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Oct 18 1973 12:00AM