A Toolkit for Accelerated Bridge Construction
This project brief provides an overview of the Strategic Highway Research Program 2 (SHRP 2) Project R04: Innovative Bridge Designs for Rapid Renewal, which developed standardized approaches to designing and constructing complete bridge systems. SHRP 2 Project R04 created the SHRP 2 Accelerated Bridge Construction (ABC) Toolkit, which includes recommended design standards and design examples for complete prefabricated bridge systems for routine bridges with span lengths from 40 ft to 130 ft. The Toolkit also includes recommended specification language for ABC systems for future inclusion in the American Association of State Highway and Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design and Construction Specifications. The ABC design standards developed in this project were used in pilot projects in Iowa, New York, and Vermont.
- Record URL:
-
Supplemental Notes:
- Distribution, posting, or copying of this PDF is strictly prohibited without written permission of the Transportation Research Board of the National Academy of Sciences. Unless otherwise indicated, all materials in this PDF are copyrighted by the National Academy of Sciences. Copyright © National Academy of Sciences. All rights reserved
- Publication Date: 2013-6
Language
- English
Media Info
- Media Type: Web
- Features: Photos;
- Pagination: 4p
-
Serial:
- SHRP 2 Project Brief
- Publisher: Transportation Research Board
Subject/Index Terms
- TRT Terms: Accelerated bridge construction; Bridge design; Design standards; Prefabricated bridges; Research projects; Specifications
- Identifier Terms: Strategic Highway Research Program 2
- Subject Areas: Bridges and other structures; Construction; Design; Highways; I24: Design of Bridges and Retaining Walls; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 01483512
- Record Type: Publication
- Files: TRIS, TRB, ATRI
- Created Date: Jun 10 2013 1:36PM