ROAD AND RAIL CRANES FOR MORE RAPID BRIDGE REPLACEMENT

SCHNELLER BRUECKENWECHSEL MIT SCHIENEN- UND STRASSENKRANEN

A railway bridge on the Stehrung--Stockach section was constructed within the prescribed limit of 48 hours. The lifting was accomplished with the aid of two road and two rail-mounted cranes, and the rail traffic was able to be resumed only four hours after the work had been completed. The entire operation, which is illustrated by several pictures, and also the preparations for the erection work, are discussed in the article.

  • Corporate Authors:

    Krausskopf Verlag fuer Wirtschaft GmbH

    Lessingstrasse 12-14
    Mainz,   Germany 
  • Authors:
    • Heitz, E
  • Publication Date: 1972-11

Media Info

  • Pagination: p. 863-865
  • Serial:
    • Foerdern und Heben
    • Volume: 22
    • Issue Number: 15
    • Publisher: Krausskopf Verlag fuer Wirtschaft GmbH

Subject/Index Terms

Filing Info

  • Accession Number: 00046095
  • Record Type: Publication
  • Source Agency: Engineering Index
  • Files: TRIS
  • Created Date: Jul 31 1976 12:00AM