DEEP-PLOW LIME STABILIZATION FOR PAVEMENT CONSTRUCTION

Deep-plow lime stabilization equipment and procedures for treating substantial thicknesses (30 cm - 90 cm) of in situ subgrade soil are described. Field study data and results are summarized and potential field applications are considered. It is concluded that deep-plow lime stabilization procedures can be successfully utilized in pavement construction if appropriate consideration is given to stabilization objectives and quality control requirements.