DESIGN SECTION K001: VIENNA ROUTE. SUBSURFACE INVESTIGATION
RESULTS OF 8 BORINGS MADE IN SECTION K001 OF VIENNA ROUTE BETWEEN THE TURNOUT FROM HUNTINGTON ROUTE AND COURT HOUSE STATION ARE SUMMARIZED. THE PURPOSE OF THE WORK WAS TO PROVIDE ADDITIONAL INFORMATION ON THE CHARACTER OF THE SOIL AND ROCK THROUGH WHICH THE PLANNED TUNNELS WOULD PASS. THE REPORT CONTAINS REVISED GEOLOGICAL SECTIONS, LOGS OF THE BORINGS, RESULTS OF LABORATORY TESTS ON SPLIT-SPOON AND UNDISTURBED SAMPLES, UNCONFINED COMPRESSION TESTS ON ROCK CORES AND CONCLUSIONS REGARDING SUBSURFACE CONDITIONS. -AUTHOR/
-
Supplemental Notes:
- Rept No MRWJ-72-66
-
Corporate Authors:
Mueser, Rutledge, Wentworth & Johnston
New York, NY United States - Publication Date: 1972-3-24
Media Info
- Pagination: 26 p.
Subject/Index Terms
- TRT Terms: Boring; Compression tests; General surface features of the earth; Geological surveying; Laboratory tests; Logs; Rocks; Samplers; Soils
- Old TRIS Terms: Geologic sections; Split spoon sampler; Subsurface explorations
- Subject Areas: Geotechnology; Highways;
Filing Info
- Accession Number: 00230318
- Record Type: Publication
- Source Agency: National Technical Information Service
- Files: TRIS
- Created Date: Jan 11 1974 12:00AM