SECTION B006: GLENMONT ROUTE, SUBSURFACE INVESTIGATIONS RETAINING WALL LOCATIONS BETWEEN STATIONS 226 PLUS 48
RESULTS OF 16 BORINGS PERFORMED AT CERTAIN LOCATIONS ALONG GLENMONT ROUTE ON THE METROPOLITAN BRANCH OF B AND O RAILROAD ARE SUMMARIZED HEREIN. THE PURPOSE OF THE WORK WAS TO PROVIDE INFORMATION ON SUBSOIL CONDITIONS AT THE LOCATION OF 11 RETAINING WALLS TO BE CONSTRUCTED FOR THE SUBWAY LINE. THE REPORT CONTAINS GEOLOGICAL SECTIONS AT THE STRUCTURES, LOGS OF THE BORINGS, RESULTS OF LABORATORY TESTS ON SPLIT-SPOON AND UNDISTURBED SOIL SAMPLES AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES. /AUTHOR/
-
Supplemental Notes:
- Rept No MRWJ-72-65
-
Corporate Authors:
Mueser, Rutledge, Wentworth & Johnston
New York, NY United States - Publication Date: 1972-1-31
Media Info
- Pagination: 42 p.
Subject/Index Terms
- TRT Terms: Boring; Construction; General surface features of the earth; Logs; Retaining walls; Samplers; Soils; Subsoil; Subways
- Old TRIS Terms: Geologic sections; Split spoon sampler; Subway construction
- Subject Areas: Construction; Geotechnology; Highways;
Filing Info
- Accession Number: 00230293
- Record Type: Publication
- Source Agency: National Technical Information Service
- Files: TRIS
- Created Date: Dec 11 1973 12:00AM