SUBSURFACE INVESTIGATION, GREENBELT ROUTE, STATIONS 3 PLUS 005 (E001) TO 259 PLUS 30 (E004)

RESULTS OF 95 BORINGS MADE ALONG GREENBELT ROUTE BETWEEN THE INTERSECTION OF F AND 7TH STREETS N. W. AND THE PLANNED FORT TOTTEN STATION AT THE INTERSECTION WITH THE B AND O METROPOLITAN BRANCH OF THE WASHINGTON METROPOLITAN AREA METRO SYSTEM ARE SUMMARIZED. THE REPORT CONTAINS A CONTINUOUS GEOLOGICAL SECTION ALONG THE LINE OF THE PROPOSED SUBWAY, LOGS OF THE BORINGS, RESULTS OF LABORATORY TESTS ON SPLIT-SPOON AND UNDISTURBED SAMPLES AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES. /NTIS/

  • Supplemental Notes:
    • Rept No MRWJ-71-57
  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  United States 
  • Publication Date: 1971-10

Media Info

  • Pagination: 246 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00230286
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Files: TRIS
  • Created Date: Jan 11 1974 12:00AM