SUBSURFACE INVESTIGATION, GREENBELT ROUTE, STATIONS 3 PLUS 005 (E001) TO 259 PLUS 30 (E004)
RESULTS OF 95 BORINGS MADE ALONG GREENBELT ROUTE BETWEEN THE INTERSECTION OF F AND 7TH STREETS N. W. AND THE PLANNED FORT TOTTEN STATION AT THE INTERSECTION WITH THE B AND O METROPOLITAN BRANCH OF THE WASHINGTON METROPOLITAN AREA METRO SYSTEM ARE SUMMARIZED. THE REPORT CONTAINS A CONTINUOUS GEOLOGICAL SECTION ALONG THE LINE OF THE PROPOSED SUBWAY, LOGS OF THE BORINGS, RESULTS OF LABORATORY TESTS ON SPLIT-SPOON AND UNDISTURBED SAMPLES AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES. /NTIS/
-
Supplemental Notes:
- Rept No MRWJ-71-57
-
Corporate Authors:
Mueser, Rutledge, Wentworth & Johnston
New York, NY United States - Publication Date: 1971-10
Media Info
- Pagination: 246 p.
Subject/Index Terms
- TRT Terms: Boring; Construction; General surface features of the earth; Laboratory tests; Logs; Subsoil; Subways
- Old TRIS Terms: Geologic sections; Subway construction
- Subject Areas: Construction; Geotechnology; Highways;
Filing Info
- Accession Number: 00230286
- Record Type: Publication
- Source Agency: National Technical Information Service
- Files: TRIS
- Created Date: Jan 11 1974 12:00AM