SUBSURFACE INVESTIGATIONS. PORTIONS OF CONNECTICUT AVENUE

RESULTS OF 23 BORINGS PERFORMED ON THE PROPOSED SUBWAY LINE IN PHASE I BETWEEN LAFAYETTE PARK AND UNION STATION OF THE WASHINGTON METROPOLITAN AREA METRO SYSTEM ARE SUMMARIZED IN THE PRELIMINARY REPORT. IT CONTAINS A SERIES OF GEOLOGICAL SECTIONS ALONG THE SUBWAY, LOGS OF THE BORINGS, ENGINEERING LABORATORY TEST RESULTS AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES. /AUTHOR/

  • Supplemental Notes:
    • MRWJ-66-1
  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  United States 
  • Publication Date: 1966-8-8

Media Info

  • Pagination: 138 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00230284
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Files: TRIS
  • Created Date: Jan 31 1974 12:00AM