DESIGN SECTION D009: NEW CARROLLTON ROUTE--SUBSURFACE INVESTIGATION

RESULTS OF 13 SUPPLEMENTARY BORINGS MADE IN SECTION D0009 OF NEW CARROLLTON ROUTE BETWEEN 19TH STREET, SE AND THE APPROXIMATE NORTHEAST BOUNDARY OF THE RFK STADIUM PARKING LOT OF THE WASHINGTON METROPOLITAN AREA METRO SYSTEM ARE SUMMARIZED. THE REPORT CONTAINS A CONTINUOUS GEOLOGICAL SECTION ALONG THE SUBWAY PAST THESE BORINGS, LOGS OF THE BORINGS, RESULTS OF LABORATORY TESTING OF SOILS, CONCLUSIONS REGARDING SUBSOIL PROPERTIES AND A SUMMARY OF ANTICIPATED DESIGN AND CONSTRUCTION PROBLEMS. /AUTHOR/

  • Corporate Authors:

    Mueser, Rutledge, Wentworth & Johnston

    New York, NY  United States 
  • Publication Date: 1973-2

Media Info

  • Pagination: 56 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00230279
  • Record Type: Publication
  • Source Agency: National Technical Information Service
  • Report/Paper Numbers: MRWJ-73-81
  • Files: TRIS
  • Created Date: Dec 4 1973 12:00AM