SUBSURFACE INVESTIGATION--PORTION OF CONNECTICUT AVENUE ROUTE BETWEEN COLUMBIA ROAD AND VAN NESS STREET
RESULTS OF 32 TEST BORINGS PERFORMED ON THE PROPOSED SUBWAY LINE IN PHASE III BETWEEN COLUMBIA ROAD AND VAN NESS STREET ARE SUMMARIZED IN THE PRELIMINARY REPORT. IT CONTAINS A SERIES OF GEOLOGICAL SECTIONS ALONG THE SUBWAY, LOGS OF THE BORINGS, ENGINEERING LABORATORY TEST RESULTS AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES. /AUTHOR/
-
Supplemental Notes:
- MRWJ-66-33
-
Corporate Authors:
Mueser, Rutledge, Wentworth & Johnston
New York, NY United States - Publication Date: 1966-10-19
Media Info
- Pagination: 185 p.
Subject/Index Terms
- TRT Terms: Boring; Construction; Laboratory tests; Properties of materials; Records management; Soils; Subsoil; Subways
- Uncontrolled Terms: Soil properties
- Old TRIS Terms: Subway construction
- Subject Areas: Construction; Finance; Geotechnology; Highways; Materials;
Filing Info
- Accession Number: 00230270
- Record Type: Publication
- Source Agency: National Technical Information Service
- Files: TRIS
- Created Date: Dec 4 1973 12:00AM