SUBSURFACE INVESTIGATION. PORTIONS OF B/O ROUTE BETWEEN 3RD STREET, N.W. AND K STREET, N.E.
RESULTS OF 12 BORINGS PERFORMED ON THE SUBWAY LINE IN PHASE I BETWEEN D STREET, NW AND UNION STATION ARE SUMMARIZED IN THE PRELIMINARY REPORT. IT CONTAINS A SERIES OF GEOLOGICAL SECTIONS ALONG THE SUBWAY, LOGS OF THE BORINGS, ENGINEERING LABORATORY TEST RESULTS AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES. /AUTHOR/
-
Supplemental Notes:
- Rept No MRWJ-67-7
-
Corporate Authors:
Mueser, Rutledge, Wentworth & Johnston
New York, NY United States - Publication Date: 1967-4-14
Media Info
- Pagination: 103 p.
Subject/Index Terms
- TRT Terms: Boring; Construction; Laboratory tests; Properties of materials; Records management; Soils; Subsoil; Subways
- Uncontrolled Terms: Soil properties
- Old TRIS Terms: Subway construction
- Subject Areas: Construction; Finance; Geotechnology; Highways; Materials;
Filing Info
- Accession Number: 00230266
- Record Type: Publication
- Source Agency: National Technical Information Service
- Files: TRIS
- Created Date: Dec 4 1973 12:00AM