CONNECTICUT AVENUE ROUTE- SUBSURFACE INVESTIGATION, BORING AT 15TH STREET AND G STREET, NW
RESULTS OF A SINGLE BORING MADE AT 15TH AND G STREETS, NW IN A SUPPLEMENTARY INVESTIGATION FOR CONNECTICUT AVENUE ROUTE ARE SUMMARIZED IN THE REPORT. IT CONTAINS A REVISED GEOLOGICAL SECTION THROUGH THE BORING LOCATION, A LOG OF THE BORING, ENGINEERING LABORATORY TEST RESULTS AND CONCLUSIONS REGARDING SUBSOIL PROPERTIES AFFECTING DESIGN OF FLEXIBLE TUNNEL LINING NEAR THIS LOCATION. /AUTHOR/
-
Supplemental Notes:
- Rept No MRWJ-68-15
-
Corporate Authors:
Mueser, Rutledge, Wentworth & Johnston
New York, NY United States - Publication Date: 1968-4-12
Media Info
- Pagination: 22 p.
Subject/Index Terms
- TRT Terms: Boring; Construction; Design; Laboratory tests; Location; Properties of materials; Records management; Soils; Subsoil; Subways; Tunnel lining
- Uncontrolled Terms: Soil properties
- Old TRIS Terms: Borings location; Subway construction
- Subject Areas: Construction; Design; Finance; Geotechnology; Highways; Materials;
Filing Info
- Accession Number: 00230261
- Record Type: Publication
- Source Agency: National Technical Information Service
- Files: TRIS
- Created Date: Dec 4 1973 12:00AM