UNSHEATHED STEEL CAR PARK OVER RAILWAY AIRSPACE

A DESCRIPTION IS GIVEN OF THE METHODS EMPLOYED TO SOLVE THE PROBLEM OF ERECTING A 300-CAR PARKING GARAGE OVER A WEDGE-SHAPED PORTION OF RIGHT-OF-WAY OVER RAILROAD TRACKS THAT WERE LARGELY INACCESSIBLE FOR HEAVY BUILDING EQUIPMENT. THE STRUCTURE, WHICH UTILIZED PLATE WEB GIRDERS, WAS COMPLETED IN ABOUT THREE MONTHS, APART FROM FINISHES. THE MAIN REQUIREMENT FOR ERECTION WAS CENTRAL LOCATION OF A LARGE-CAPACITY CRANE.

  • Corporate Authors:

    Centre Belgo-Luxembourg d'Information de l'Acier

    47 rue Montoyer
    B-1040 Brussels,   Belgium 
  • Authors:
    • Bambach, J D
  • Publication Date: 1972-6

Media Info

  • Features: Figures;
  • Pagination: p. 285-7
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00226516
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Apr 2 1973 12:00AM