VOLUME VIII - GREEN BAND DESIGN

BOTH HARDWARE AND SOFTWARE DESIGN ARE INCLUDED. THE MATERIAL HAS BEEN LIMITED TO THAT WHICH IS PECULIAR TO THE GREEN BAND SYSTEM. SECTION 1 DESCRIBES THE GREEN BAND SYSTEM CONCEPT AND INCLUDES A DISCUSSION OF THE VARIOUS OPERATING MODES AND THEIR APPLICATIONS. SECTION 2 DESCRIBES THE HARDWARE DESIGN CHANGES THAT WERE REQUIRED TO CONVERT THE PACER SYSTEM TO THE GREEN BAND SYSTEM. AS DESCRIBED, THESE CHANGES WERE LIMITED ESSENTIALLY TO MODIFYING THE RAMP CONFIGURATION. SECTION 3 SPECIFIES THE ALGORITHMS WHICH DESCRIBE THE FUNCTIONAL OPERATIONS OF THE GREEN BAND SYSTEM. SECTION 4 DISCUSSES THE ALGORITHMS WHICH DESCRIBE THE FUNCTIONAL OPERATIONS OF THE GREEN BAND SYSTEM. SECTION 4 DISCUSSES THE SOFTWARE DESIGNS PECULIAR TO THE GREEN BAND SYSTEM. REFERENCES ARE MADE TO PACER SYSTEM SOFTWARE AS APPLICABLE. SECTION 5 PROVIDES THE DETAILED LISTINGS FOR THE SOFTWARE PROGRAMS DISCUSSED IN SECTION 4. /AUTHOR/

  • Corporate Authors:

    Raytheon Company

    ,    

    Federal Highway Administration

    1200 New Jersey Avenue, SE
    Washington, DC  United States  20590
  • Publication Date: 0

Subject/Index Terms

Filing Info

  • Accession Number: 00224988
  • Record Type: Publication
  • Source Agency: Federal Highway Administration
  • Files: TRIS, USDOT
  • Created Date: Aug 8 1971 12:00AM