HARBOR FREEWAY RAMP CLOSURE
THE EFFECT IS INVESTIGATED OF RAMP CLOSURE ON THE TRAFFIC OPERATIONS OF A FREEWAY AND AN ADJACENT ARTERIAL STREET. TRAFFIC OPERATION ON THE FREEWAY DURING PEAK HOURS EXPERIENCED CONGESTION DUE TO ADDITIONAL DEMAND AND POOR GEOMETRIC DESIGN OF THE FIGUEROA ON-RAMP. CLOSURE OF THIS RAMP RESULTED IN IMPROVEMENT IN THE TRAFFIC FLOW ON THE FREEWAY WITHOUT SERIOUSLY AFFECTING THE OPERATION OF THE ARTERIAL. IT WAS CONCLUDED THAT WHERE UNUSED CAPACITY IS AVAILABLE ON ALTERNATE ROUTES RAMP CLOSURE CAN RESULT IN IMPROVEMENT TO FREEWAY OPERATION AND AN APPRECIABLE TIME- SAVING TO THE COMBINED SYSTEM. /BPR/
-
Supplemental Notes:
- Hpr, C-3-1
-
Corporate Authors:
California Division of Highways
Bridge Department
Sacramento, CA United States 05914 -
Authors:
- Johnson, R T
- Publication Date: 1966-11
Subject/Index Terms
- TRT Terms: Arterial highways; Freeway operations; Geometric design; Harbors; Highway operations; Interchange ramps; On ramps; Peak hour traffic; Streets; Traffic; Traffic congestion; Traffic flow
- Old TRIS Terms: Closing; Freeway ramps; Harbor facilities
- Subject Areas: Highways; Marine Transportation; Operations and Traffic Management; Terminals and Facilities;
Filing Info
- Accession Number: 00224841
- Record Type: Publication
- Source Agency: Bureau of Public Roads /US
- Files: TRIS
- Created Date: Jan 23 1994 12:00AM