PROBLEMS IN MAJOR BOILER FEED PUMP PROJECTS
This article gives a general account of the condensate and boiler feed pump layouts employed most usually. The factors governing selection and projection are discussed, together with various drives and methods of control. Operational reliability, economy and investment costs are compared, and the influence on feed pump design of the high availability demanded from these machines today is mentioned.
-
Corporate Authors:
Sulzer Brothers Limited
CH-8401
Winterthur, Switzerland -
Authors:
- Pedotti, G P
- Publication Date: 1971
Media Info
- Pagination: p. 69-77
-
Serial:
- Sulzer Technical Review
- Volume: 53
- Issue Number: 2
- Publisher: Sulzer Brothers Limited
Subject/Index Terms
- TRT Terms: Condensate; Feedwater heaters; Water pumps
- Old TRIS Terms: Condensate systems; Feed water pumps
- Subject Areas: Marine Transportation; Vehicles and Equipment;
Filing Info
- Accession Number: 00039775
- Record Type: Publication
- Source Agency: Engineering Index
- Files: TRIS
- Created Date: Jan 5 1973 12:00AM