Evaluation of the Buena Vista IBRD Bridge: A Furthering of Accelerated Bridge Construction in Iowa
The need to construct bridges that last longer, are less expensive, and take less time to build has increased. The importance of accelerated bridge construction (ABC) technologies has been realized by the Federal Highway Administration (FHWA) and the Iowa Department of Transportation (DOT) Office of Bridges and Structures. This project is another in a series of ABC bridge projects undertaken by the Iowa DOT. Buena Vista County, Iowa, with the assistance of the Iowa Department of Transportation (DOT) and the Bridge Engineering Center (BEC) at Iowa State University, constructed a two-lane single-span precast box girder bridge, using rapid construction techniques. The design involved the use of precast, pretensioned components for the bridge superstructure, substructure, and backwalls. This application and demonstration represents an important step in the development and advancement of these techniques in Iowa as well as nationwide. Prior funding for the design and construction of this bridge (including materials) was obtained through the FHWA Innovative Bridge Research and Deployment (IBRD) Program. The Iowa Highway Research Board (IHRB) provided additional funding to test and evaluate the bridge. This project directly addresses the IBRD goal of demonstrating (and documenting) the effectiveness of innovative materials and construction techniques for the construction of new bridge structures. Evaluation of performance was formulated through comparisons with design assumptions and recognized codes and standards including American Association of State Highway and Transportation Officials (AASHTO) specifications.
- Record URL:
-
-
Corporate Authors:
Bridge Engineering Center
2711 South Loop Drive, Suite 4700
Ames, Iowa United States 50010-8664Iowa Highway Research Board
Iowa Department of Transportation
800 Lincoln Way
Ames, IA United States 50010 -
Authors:
- Phares, Brent
- Wipf, Terry
- Nielsen, Stuart
- Klaiber, Wayne
- Publication Date: 2012-2
Language
- English
Media Info
- Media Type: Print
- Edition: Final Report
- Features: Appendices; Figures; References; Tables;
- Pagination: 92p
Subject/Index Terms
- TRT Terms: Box girder bridges; Bridge construction; Bridge design; Innovation; Precast concrete
- Uncontrolled Terms: Accelerated construction
- Geographic Terms: Iowa
- Subject Areas: Bridges and other structures; Construction; Highways; I53: Construction of Bridges and Retaining Walls;
Filing Info
- Accession Number: 01370160
- Record Type: Publication
- Report/Paper Numbers: IHRB Project TR-605, InTrans Project 08-342
- Files: TRIS
- Created Date: May 16 2012 3:06PM