I-35W URBAN CORRIDOR DEMONSTRATION PROJECT: BUS-METERED FREEWAY SYSTEM
THE FINAL REPORT SUMMARIZES THE MATERIAL PRESENTED IN PREVIOUS REPORTS AND PRESENTS AN EVALUATION OF THE DEMONSTRATION PROJECT, ALONG WITH RECOMMENDATIONS FOR ITS CONTINUATION IN A DEVELOPMENT PHASE. THE PROJECT SOUGHT TO DETERMINE THE FEASIBILITY OF A PRIORITY BUS FREEWAY SYSTEM ALONG I-35W IN THE TWIN CITIES REGION. IT IS ESTIMATED THAT OPERATING REVENUES WILL SHOW A SLIGHT MARGIN OVER OPERATING COSTS; IF OPERATING COSTS FOR THE SURVEILLANCE AND CONTROL SYSTEM, TOGETHER WITH MARKETING COSTS, ARE INCLUDED, THEN THE CONTINUED PROJECT WILL SHOW AN ANNUAL LOSS OF ABOUT $200,000. HOWEVER, THIS OMITS INDIRECT BENEFITS, SUCH AS USE OF THE SURVEILLANCE AND CONTROL SYSTEM AS A RESEARCH TOOL, REDUCED PARKING REQUIREMENTS IN THE CBD, INCREASED ACCESSIBILITY TO THE CBD, HIGHER LEVELS OF SERVICE AND LOWER ACCIDENT RATES ON THE CORRIDOR, IMPROVED MOBILITY FOR CORRIDOR RESIDENTS, AND INCREASED KNOWLEDGE ABOUT THE FACTORS INFLUENCING MODAL SELECTION.
-
Supplemental Notes:
- 4 APP
-
Corporate Authors:
Minnesota Department of Highways
, - Publication Date: 1971-9
Media Info
- Features: Figures; Tables;
- Pagination: 165 p.
Subject/Index Terms
- TRT Terms: Bus lanes; Bus priority; Bus transportation; Control systems; Costs; Interchange ramps; Operating costs; Operating revenues; Parking; Traffic surveillance; Urban transportation
- Old TRIS Terms: Capitalized costs; Freeway ramps
- Subject Areas: Finance; Highways; Motor Carriers; Operations and Traffic Management; Public Transportation;
Filing Info
- Accession Number: 00226680
- Record Type: Publication
- Report/Paper Numbers: Final Rept
- Files: TRIS, STATEDOT
- Created Date: Aug 20 1973 12:00AM