PRELIMINARY SURVEY OF POTENTIAL STOL TERMINAL AREA OPERATIONAL REQUIREMENTS

A PRELIMINARY SURVEY OF POTENTIAL OPERATIONAL REQUIREMENTS FOR STOL IN THE TERMINAL AREA HAS BEEN MADE. THE PRESENTATION OF THIS SURVEY IS IN THESE SECTIONS. THE FIRST SECTION PRESENTS THE MOTIVATION FOR THE SURVEY, WHICH CAN BE SUMMARIZED AS THE NECESSITY FOR THE FEDERAL GOVERNMENT TO HAVE A KNOWLEDGE OF THE POTENTIAL OPERATIONAL REQUIREMENTS OF STOL. THE SECOND SECTION DISCUSSES THE MARKETS IN WHICH STOL MAY BE FOUND VIABLE. THIS DISCUSSION IS LIMITED TO THOSE ASPECTS WHICH ARE NECESSARY TO DETERMINE THE EFFECTS OF THESE MARKETS ON SHAPING FUTURE STOL OPERATIONS. THE FINAL SECTION CONSISTS OF A DESCRIPTION OF TERMINAL AREA OPERATIONS AS THEY CURRENTLY EXIST, OF POSSIBLE OPERATIONAL CHANGES THAT MAY OCCUR EXCLUSIVE OF THE INTRODUCTION OF STOL, AND THEN OF POTENTIAL OPERATIONAL REQUIREMENTS OF STOL IN THE TERMINAL AREA. /AUTHOR/

  • Record URL:
  • Supplemental Notes:
    • NO DOT-TSC-FAA-71-9
  • Corporate Authors:

    Transportation Systems Center

    55 Broadway, Kendall Square
    Cambridge, MA  United States  02142
  • Authors:
    • Stevenson, L E
  • Publication Date: 0

Media Info

  • Features: References;
  • Pagination: 44 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00226632
  • Record Type: Publication
  • Source Agency: International Aerospace Abstracts
  • Report/Paper Numbers: Intrm Rept
  • Files: NTL, TRIS
  • Created Date: Jul 16 1974 12:00AM