Hydroseed Challenges, Hydroseed Solutions
Difficult terrain such as slopes, wetlands, desert, and steep mountains, along with challenges such as wind, lack of access, and other logistical problems, all require creative approaches for hydroseeding companies. This articles discusses the challenges and solutions of three specific projects: the Horsetooth Reservoir in Colorado, the Ruby Natural Gas Pipeline running from the southwest corner of Wyoming to southern Oregon, and the Garden State Parkway Expansion in New Jersey.
- Record URL:
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/10737227
-
Authors:
- Aird, Janet
- Publication Date: 2012-1
Language
- English
Media Info
- Media Type: Print
- Features: Photos;
- Pagination: pp 20-29
-
Serial:
- Erosion Control
- Volume: 19
- Issue Number: 1
- Publisher: Forester Media
- ISSN: 1073-7227
Subject/Index Terms
- TRT Terms: Case studies; Construction projects; Environmental impacts; Erosion control; Land reclamation; Landscaping; Mulches; Mulching; Planting; Revegetation; Seeding; Seeds; Slopes
- Identifier Terms: Garden State Parkway
- Uncontrolled Terms: Hydroseeding
- Subject Areas: Environment; Geotechnology; Highways; Hydraulics and Hydrology; I15: Environment; I51: Earthworks and Soil Drainage;
Filing Info
- Accession Number: 01361361
- Record Type: Publication
- Files: TRIS
- Created Date: Jan 25 2012 2:23PM