Risk Assessment of Underwater Gas Shield Tunnel
According to the basic principles of risk assessment and the characteristics of construction and operation phases of underwater gas shield tunnel, The method on the risk rating assessment of construction and operational phases of underwater gas shield tunnel is described in the paper. Combined with qualitative and quantitative analysis, the paper analyzed all risk factors legitimately and the risk control and management are shown to be effective. The paper described the specific application of risk assessment theory which was being impressed on the construction of Xi-Jiang shield tunnel.
- Record URL:
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/isbn/9780784412022
-
Supplemental Notes:
- Copyright © 2011 ASCE
-
Corporate Authors:
American Society of Civil Engineers
1801 Alexander Bell Drive
Reston, VA United States 20191-4400 -
Authors:
- Zeng, Hongbing
- Zhang, Wentao
- Feng, Ke
- Xiang, Zhiqiang
- Kang, Rui
-
Conference:
- International Conference on Pipelines and Trenchless Technology 2011
- Location: Beijing , China
- Date: 2011-10-26 to 2011-10-29
- Publication Date: 2011
Language
- English
Media Info
- Media Type: Digital/other
- Features: References;
- Pagination: pp 1697-1704
- Monograph Title: ICPTT 2011: Sustainable Solutions For Water, Sewer, Gas, And Oil Pipelines
Subject/Index Terms
- TRT Terms: Construction; Gas pipelines; Qualitative analysis; Quantitative analysis; Risk assessment; Tunnels; Underwater pipelines
- Subject Areas: Bridges and other structures; Construction; Pipelines; I25: Design of Tunnels;
Filing Info
- Accession Number: 01469682
- Record Type: Publication
- ISBN: 9780784412022
- Files: TRIS, ASCE
- Created Date: Jan 17 2013 1:48PM