Measurement Results for Power Facilities in FASTECH360 High-speed Running Tests
In order to achieve an increase in Shinkansen commercial operation speeds, the effect on wayside facilities of increases in wind speed and vibration by passing trains needs to be evaluated. The overhead contact line system, lighting and power equipment including lamps and snow melting devices at turnouts, and power transforming equipment are among wayside power facilities requiring evaluation. Thus the authors evaluated the effect on those facilities using FASTECH360 high-speed test trains in running tests and confirmed that there are no problems in running at 360 km/h. This article will report the FASTECH360 high speed running tests power equipment measurement and evaluation results.
- Record URL:
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/oclc/51815943
-
Authors:
- Nishi, Kentaro
- Iwainaka, Atsushi
- Publication Date: 2010
Language
- English
Media Info
- Media Type: Print
- Features: Figures; References; Tables;
- Pagination: pp 43-46
-
Serial:
- JR East Technical Review
- Volume: 16
- Publisher: East Japan Railway Culture Foundation
- ISSN: 1347-8907
- Serial URL: https://www.jreast.co.jp/e/development/tech/
Subject/Index Terms
- TRT Terms: Electric power generation; High speed rail; Lighting equipment; Operating speed; Snowmelt; Testing; Vibration
- Identifier Terms: FASTECH360; Shinkansen
- Uncontrolled Terms: Wind speed
- Subject Areas: Operations and Traffic Management; Planning and Forecasting; Railroads; Terminals and Facilities; I72: Traffic and Transport Planning;
Filing Info
- Accession Number: 01337677
- Record Type: Publication
- Files: TRIS
- Created Date: Apr 25 2011 7:04AM