MONTPELIER HAS A TEN-YEAR ROAD FUND

THE CAPITOL CITY OF VERMONT INVENTORIES ALL 52 MILES OF ROAD AS TO THEIR CONDITION, WHEN IT WAS LAST TREATED, HOW MUCH TRAFFIC BORE, AND WHEN IT SHOULD BE RESURFACED. AFTER EVERY STREET HAD BEEN INSPECTED A MASTER LIST OUTLINING A PROPOSED TEN-YEAR PROGRAM WAS PREPARED. THE PROGRAM REFLECTED THE AMOUNT OF RETREATMENT WORK THAT WAS DEEMED NECESSARY EACH YEAR IN ORDER TO BRING EVERY STREET TO AN ACCEPTABLE LEVEL AND TO BE MAINTAINED. THE POLITICS OF FUNDING SUCH A PLAN IS DISCUSSED AS IS THE COST OF THE PLAN. /HRIS/

  • Corporate Authors:

    National Asphalt Pavement Association (NAPA)

    5100 Forbes Boulevard
    Lanham, Maryland  United States  20706
  • Authors:
    • Fournier, P
  • Publication Date: 1973-9

Media Info

  • Features: Photos;
  • Pagination: p. 9-11
  • Serial:

Subject/Index Terms

Filing Info

  • Accession Number: 00219179
  • Record Type: Publication
  • Files: TRIS
  • Created Date: Jun 5 1974 12:00AM