TUNNELS IN THE TONGARIRO POWER DEVELOPMENT
THE ARTICLE DESCRIBES THE DIFFICULTIES ENCOUNTERED IN THE DRIVING THROUGH VOLCANIC AND SEDIMENTARY ROCK OF THE 28 MILES OF TUNNEL FORMING PART OF THE TONGARIRO HYDRO-ELECTRIC POWER DEVELOPMENT IN THE NORTH ISLAND OF NEW ZEALAND.
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/0041414X
-
Authors:
- Davie, J
- Publication Date: 1971-11-12
Language
- English
Media Info
- Features: Figures; Photos;
- Pagination: p. 420-4
-
Serial:
- Tunnels & Tunnelling International
- Volume: 3
- Issue Number: 6
- Publisher: Progressive Media Markets, Ltd
- ISSN: 0041-414X
Subject/Index Terms
- TRT Terms: Construction management; Drilling; Sedimentary rocks; Tunnel lining; Tunneling; Volcanic deposits
- Subject Areas: Bridges and other structures; Construction; Highways;
Filing Info
- Accession Number: 00215727
- Record Type: Publication
- Source Agency: Transport and Road Research Laboratory (TRRL)
- Files: TRIS
- Created Date: Sep 25 1972 12:00AM