THE EARLY TRAFFICKING OF BONDED CEMENT MORTAR SURFACINGS ON CONCRETE ROADS. TECHNICAL REPORT
SCALED CONCRETE ROAD SURFACES REPAIRED BY BONDED SURFACINGS OF PORTLAND CEMENT MORTAR OR CONCRETE ARE USUALLY CLOSED TO TRAFFIC FOR 3 TO 7 DAYS TO DEVELOP STRENGTH. LABORATORY AND FIELD TRIALS TO EXAMINE THE POSSIBILITY OF OPENING CEMENT MORTAR REPAIRS TO TRAFFIC WITHIN 24 HOURS ARE DEVELOPED. TESTS HAVE SHOWN THAT MORTAR SURFACINGS LESS THAN 1/2 IN. THICK DEVELOP A CUBE STRENGTH OF THE ORDER OF 4000 LBS PER SQ. IN. WITHIN 24 HOURS, CAN BE OPENED TO HEAVY COMMERICAL RUBBER-TIRED TRAFFIC. /RRL/
-
Supplemental Notes:
- 6 Pp, 6 Tab, 5 REF
-
Corporate Authors:
Cement and Concrete Association
52 Grosvenor Gardens
London SW1W 0AQ, England -
Authors:
- Lilley, A A
- Publication Date: 1967-12
Subject/Index Terms
- TRT Terms: Bonds; Cement mortars; Concrete pavements; Field tests; Laboratory tests; Portland cement; Repairing; Strength of materials; Surfacing; Thickness; Time; Tires
- Uncontrolled Terms: Opening to traffic; Repairs
- Subject Areas: Highways; Maintenance and Preservation; Materials; Vehicles and Equipment;
Filing Info
- Accession Number: 00218349
- Record Type: Publication
- Source Agency: Road Research Laboratory /UK
- Files: TRIS
- Created Date: Oct 13 1970 12:00AM