REPLICATION OF EYE-BARS AND MEASUREMENT OF LOSSES IN CROSS SECTION DUE TO CORROSION

THE REMOVAL, BY HIGH PRESSURE WATER BLASTING, OF RUST ACCUMULATED BETWEEN THE EYE BARS AT PIN CONNECTIONS ON THE CENTRAL BRIDGE OVER THE OHIO RIVER AT NEWPORT, REVEALED CRITICAL DETERIORATION. THE PRODUCTION OF ACCURATE CASTINGS OF THE EYE BARS FROM IN-SITU MOULDINGS ENABLED MEASUREMENT OF LOSSES IN CROSS SECTION CAUSED BY CORROSION. /RRL/

  • Record URL:
  • Supplemental Notes:
    • Res Rept KyP-56, 31 PP, FIGS, 9 PHOT
  • Corporate Authors:

    Kentucky Department Highways

    ,    
  • Authors:
    • Rahal, A S
    • Philpot, J R
  • Publication Date: 1970-7

Subject/Index Terms

Filing Info

  • Accession Number: 00216629
  • Record Type: Publication
  • Source Agency: Road Research Laboratory /UK
  • Files: TRIS, STATEDOT
  • Created Date: Nov 15 1971 12:00AM