PATCHING PAVEMENTS BETTER--STANDARD OPERATING PROCEDURE

PATCHING, AS DEVELOPED BY NORTH CAROLINA STATE HIGHWAY AND PUBLIC WORKS COMMISSION USES RIGID PATCHES OF CONCRETE WITH FLEXIBLE PATCHES OF CRUSHED STONE OVER FIRM SUBGRADE WITH 1-1/2 IN. BITUMINOUS TOP AND WITH CRUSHED MATERIAL OR SOIL-CEMENT AS SUBBASE AND BITUMINOUS SURFACE, INCLUDING THE SEALING OF CRACKS IN BITUMINOUS SURFACE.

  • Supplemental Notes:
    • Vol 80, No 4, PP 25-26, 42, 44
  • Publication Date: 1949-4

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00218309
  • Record Type: Publication
  • Source Agency: Highway Research Board Bibliography
  • Files: TRIS
  • Created Date: Feb 16 1970 12:00AM