OVERLAY IS SAND-ASBESTOS-ASPHALT

A RESURFACING COURSE, 3/4IN THICK HAS BEEN LAID IN THE LINCOLN TUNNEL, U.S.A. IN ONE TUBE IT COVERS AN EXISTING ASPHALT SURFACING AND IN THE OTHER IT COVERS BRICK PAVING. THE MIX CONTAINS 22 PERCENT OF 1/4-IN CRUSHED STONE, 63.5 PER CENT OF SAND, 4PER CENT OF FILLER, 2.5 PERCENT OF ASBESTOS FIBRES AND 8 PERCENT OF BITUMEN /85-100 PENETRATION THUS RESURFACING IS ESSENTIALLY EXPERIMENTAL BUT SIMILAR MATERIAL IS SAID TO HAVE GIVEN EXCELLENT SERVICE FOR THREE YEARS ON A HELICAL APPROACH TO THE TUNNEL. /RRL/