BRIDGE DECK RESTORATION METHODS AND PROCEDURES, PART II, BRIDGE DECK SEALS

SALTING TO PREVENT FROSTING IN VALLEY AREAS OR ICE IN MOUNTAIN AREAS IS CAUSING PREMATURE DECK DETERIORATION IN CALIFORNIA HIGHWAY STRUCTURES. AS A PREVENTIVE MEASURE IT IS DESIRABLE TO SEAL BRIDGE DECKS IN THESE TROUBLESOME AREAS WITH AN IMPERVIOUS MEMBRANE. ACCORDINGLY, FIELD RESEARCH IS UNDERWAY TO INVESTIGATE THE EFFECTIVENESS OF BRIDGE DECK SEALANTS. THIS REPORT COVERS: (1) INITIAL OBSERVATIONS ON 13 EXPERIMENTAL SEALING SYSTEMS, INCLUDING SOME CONSTRUCTION PROBLEMS ENCOUNTERED DURING THEIR PLACEMENT; (2) FINAL EVALUATION OF 2 SEALING SYSTEMS; (3) REQUIRED PROPERTIES FOR EFFECTIVE SEALANTS; (4) EFFECT OF SURFACE PREPARATION ON BOND; AND (5) PROBLEMS WITH HAND DISTRIBUTION OF SURFACE TEXTURING AGGREGATE. /FHWA/

  • Supplemental Notes:
    • Contract No F-10-1
  • Corporate Authors:

    California Department of Public Works

    1120 N Street
    Sacramento, CA  United States  95814

    California Division of Highways

    Bridge Department
    Sacramento, CA  United States  05914
  • Authors:
    • STEWART, C F
  • Publication Date: 1972-5

Media Info

  • Pagination: 70 p.

Subject/Index Terms

Filing Info

  • Accession Number: 00218077
  • Record Type: Publication
  • Source Agency: Federal Highway Administration
  • Files: TRIS, USDOT
  • Created Date: Apr 23 1973 12:00AM