DEVELOPMENT OF A SUITE OF PROGRAMS FOR CHECKING EXISTING DRAINAGE NETWORKS AND CALCULATING AND DESIGNING NEW NETWORKS (PRELIMINARY STUDY)

ENTWICKLUNG EINES PROGRAMMSYSTEMS ZUR UEBERPRUEFUNG VORHANDENER ENTWAESSERUNGSNETZE SOWIE BERECHNUNG UND DIMENSIONIERUNG NEUER NETZE (VORSTUDIE)

THE PLANNING AND CALCULATION OF ROAD DRAINAGE IS AN IMPORTANT DETAIL FOR DESIGN.FROM HIGHWAY DESIGN DATA SUCH AS CATCHMENT AREAS,QUANTITIES OF WATER AND GRADIENTS,THE NECESSARY DATA FOR DRAINAGE ARE TO BE DETERMINED; FROM THESE DATA BOTH INDIVIDUAL PIPES AND PIPE NETWORKS SHOULD BE ABLE TO BE DESIGNED,BOTH FOR THE CHECKING OF EXISTING FACILITIES AND THE DESIGN OF NEW SYSTEMS.FLOW AND GUSHING HAVE TO BE CONSIDERED.THE RESULTS OF THE SUITE OF PROGRAMS HAVE TO BE EVALUATED DIRECTLY IN OTHER HIGHWAY DESIGN SYSTEMS; ADDITIONALLY THE PROGRAM HAS TO BE BUILT UP IN SUCH A WAY THAT AS A RESULT PREMISES FOR TENDERING CAN BE ISSUED.

    Language

    • German

    Project

    • Status: Terminated
    • Sponsor Organizations:

      BUNDESMINISTER FUER VERKEHR

      BONN,   Germany 
    • Project Managers:

      Rudelstorfer, K

    • Performing Organizations:

      UNIVERSITY OF INNSBRUCK,INST.FUER STRASSENBAU (UNIVERSITY OF INNSBRUCK, INSTITUTE FOR ROAD CONSTRUCTION AND TRAFFIC PLANNING)

      TECHNIKERSTR.13
      INNSBRUCK,   Austria  A-6020
    • Start Date: 19730000
    • Expected Completion Date: 0
    • Actual Completion Date: 0
    • Source Data: ITRD D700154

    Subject/Index Terms

    Filing Info

    • Accession Number: 01299933
    • Record Type: Research project
    • Source Agency: Forschungsgesellschaft für Straßen- und Verkehrswesen (FGSV)
    • Files: ITRD
    • Created Date: Nov 21 2010 7:38AM