CONSTRUCTION DU VIADUC DE LA FUENTE DEL AZUFRE (LEON)

CONSTRUCCION DEL VIADUCTO DE LA FUENTE DEL AZUFRE (LEON)

CE VIADUC FRANCHIT LA DEPRESSION DU SIL ET FAIT PARTIE DU PLAN D'ACCES A LA GALICE. LES CONDITIONS DE LA GORGE ET LE BASSIN CREE PAR UN BARRAGE ONT OBLIGE A CONSTRUIRE UN VIADUC DE 260 M DE LONG REPOSANT SUR DEUX PILES SEPAREES PAR UNE TRAVEE CENTRALE DE 130 M. LE VIADUC EST SITUE SUR DES ROCHES DE TYPE GRANITIQUE. LA PROXIMITE DU BARRAGE A OBLIGE A UTILISER LE SYSTEME DE DYNAMITAGE CONTROLE DANS LES EXCAVATIONS DES PILES ET DES CULEES. IL A EGALEMENT ETE NECESSAIRE DE CONSTRUIRE UN ECRAN SUR LA RIVE GAUCHE POUR EN ASSURER LA STABILITE. LE VIADUC A ETE CONSTRUIT AU MOYEN DE CANTILEVERS SUCCESSIFS, LES VOUSSOIRS ETANT BETONNES "IN SITU". LE TABLIER EST SIMPLEMENT APPUYE SUR LES PILES, CE QUI A OBLIGE A CONSTRUIRE UNE TOUR METALLIQUE ANCREE SUR L'UN DES SUPPORTS AFIN DE FIXER LE TABLIER ET DE LUI EVITER DE BASCULER PENDANT SA CONSTRUCTION. ON A D'ABORD BETONNE LES CULEES ET CONSTRUIT LES DEUX PILES. PUIS ON A CONSTRUIT LA PREMIERE MOITIE DU TABLIER EN PARTANT DE L'UNE DES PILES, EN DEPLACANT LES DEUX CHARIOTS DE PROGRESSION ET EN BETONNANT SIMULTANEMENT DANS LES DEUX SENS. ON A REPETE LE PROCESSUS EN PARTANT DE L'AUTRE PILE ET ENFIN ON A BETONNE LE VOUSSOIR CENTRAL ET ON A MIS SOUS TENSION LES CABLES DU FOND DU TABLIER. ON A EMPLOYE DU BETON DE HAUTE RESISTANCE, A GRANULATS SILICIEUX ET SABLE CALCAIRE LAVE. UN BLONDIN PERMET D'APPORTER LE BETON A TOUS LES POINTS DU TABLIER. UNE CENTRALE DE BETONNAGE SITUEE SUR LE CHANTIER MEME A PERMIS D'EVITER LE PERTE DE QUALITE DU BETON DUE AU TRANSPORT. LA CONSTRUCTION DES PILES ET DU TABLIER A PRIS ENVIRON 16 MOIS.

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01299356
  • Record Type: Publication
  • Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
  • Files: ITRD
  • Created Date: Nov 21 2010 7:03AM