MEASUREMENTS OF EXPANSION AND PRESSURE AT THE UPPER JOINT OF A LARGE PRESTRESSED CONCRETE STRUCTURE. BRIDGE OF THE RN7 OVER THE DONZERE-MONDRAGON CANAL /IN FRENCH/

THE RESULTS OF TEMPERATURE, DEFORMATION AND COMPRESSION MEASUREMENTS CARRIED OUT IN 1965 AND 1966 AT THE CROWN OF A REINFORCED CONCRETE BRIDGE. THE SPAN MEASURES 260 M. THE MEASUREMENTS WERE USED TO OBTAIN A RELATION BETWEEN BRIDGE TEMPERATURE AND AMBIENT TEMPERATURE, A PRECISE ANALYSIS OF BRIDGE BEHAVIOR UNDER TEMPERATURE CHANGES, AND VARIATIONS IN COMPRESSION IN THE CROWN OF THE BRIDGE FROM THEORETICAL VALUES. /TRRL/

  • Corporate Authors:

    Intl Assoc Bridge & Struct Eng /Switz

    /Design of Concrete Structures Symp
    ,   United States 

    Intl Assoc Bridge & Struct Eng /Switz

    /Design of Concrete Structures Symp
    ,   United States 
  • Authors:
    • Savey, P
    • Deleglise, R
  • Publication Date: 1970-10

Language

  • English

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 00208732
  • Record Type: Publication
  • Source Agency: Transport and Road Research Laboratory (TRRL)
  • Files: TRIS
  • Created Date: Jul 9 1972 12:00AM