GRAVES-CIMENT - FABRICATION, MISE EN OEUVRE ET COMPORTEMENT AUX JEUNES AGES - RENFORCEMENT SOUS CIRCULATION EN GRAVE-CIMENT A PRISE RETARDEE, CHANTIER EXPERIMENTAL
DANS LE CADRE DES TRAVAUX DE RENFORCEMENTS COORDONNES, UN CHANTIER EXPERIMENTAL EN GRAVE-CIMENT A PRISE RETARDEE A ETE EFFECTUE EN 1975. LES TRAVAUX CONCERNAIENT LES RN 92 - 518 - 532 ET 531 DU DEPARTEMENT DE L'ISERE (ITINERAIRE VALENCE-GRENOBLE), SUR UNE LONGUEUR DE 33,8 KM, POUR UN TONNAGE DE 140000 TONNES DE GRAVE-CIMENT. L'ARTICLE COMMENTE LES RESULTATS DE L'ETUDE DES FORMULATIONS EN LABORATOIRE, DES ESSAIS ET CONSTATATIONS EN COURS DE FABRICATION ET DE LA MISE EN OEUVRE DE LA GRAVE-CIMENT A PRISE RETARDEE. AU TERME DE L'ETUDE, LE DOSAGE DE 4,3 % DE CIMENT A ETE ADOPTE, AINSI QUE LE RETARDATEUR A RAISON DE 1,1 % PAR RAPPORT AU POIDS DE CIMENT. LA FABRICATION N'A POSE AUCUN PROBLEME PARTICULIER. POUR LA MISE EN OEUVRE, LE REPANDAGE A LA NIVELEUSE PAR DEMI-CHAUSSEE A PERMIS UNE CIRCULATION ASSEZ FLUIDE. LE PROCESSUS DE MISE EN OEUVRE ADOPTE (PREMIER REGALAGE - COMPACTAGE - DEUXIEME REGALAGE - COMPACTAGE DEFINITIF) A EVITE L'OPERATION DE FIN REGLAGE PAR RACLAGE OU APPORT DE GRAVE-CIMENT. L'EXECUTION DE L'ENDUIT DE PROTECTION A EU LIEU TOUJOURS AVANT L'ADMISSION DE LA CIRCULATION. LA COUCHE DE GRAVE-CIMENT SOIGNEUSEMENT COMPACTEE ET PROTEGEE PAR SON ENDUIT DE CURE S'EST TRES BIEN COMPORTEE DU FAIT DE SA RIGIDIFACTION ASSEZ RAPIDE. SIX PLANCHES D'ESSAIS DE 300 M DE LONGUEUR FONT L'OBJET D'UN SUIVI A LONG TERME (A).
-
Availability:
- Find a library where document is available. Order URL: http://worldcat.org/issn/04585860
-
Authors:
- CASTAN, M
- GERBOD, A
- SOMBARDIER, D
- VEYSSET, J
- Publication Date: 1978-11
Language
- French
Media Info
- Pagination: 105-15
-
Serial:
- BULL LIAISON LAB PONTS CHAUSS
- Issue Number: 98
- ISSN: 0458-5860
Subject/Index Terms
- TRT Terms: Aggregates; Cement; Continuously graded aggregates; Experimental roads; Manufactures; Mix design; Retarders (Concrete); Structural strengthening; Surveillance; Tests
- Uncontrolled Terms: Laying
- Geographic Terms: France
- ITRD Terms: 4758: Ciment; 9101: Controle; 6255: Essai; 3647: Fabrication; 4714: Formulation (compos); 8036: France; 4577: Granulat; 4598: Granulat a granularite continue; 3623: Mise en oeuvre (appl); 3096: Renforcement (chaussee); 4727: Retardateur de prise; 2778: Section experimentale
- Subject Areas: Geotechnology; I61: Equipment and Maintenance Methods;
Filing Info
- Accession Number: 01295374
- Record Type: Publication
- Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
- Files: ITRD
- Created Date: Nov 21 2010 5:00AM