GRAVES-CIMENT - FABRICATION, MISE EN OEUVRE ET COMPORTEMENT AUX JEUNES AGES - RENFORCEMENT SOUS CIRCULATION EN GRAVE-CIMENT A PRISE RETARDEE, CHANTIER EXPERIMENTAL

DANS LE CADRE DES TRAVAUX DE RENFORCEMENTS COORDONNES, UN CHANTIER EXPERIMENTAL EN GRAVE-CIMENT A PRISE RETARDEE A ETE EFFECTUE EN 1975. LES TRAVAUX CONCERNAIENT LES RN 92 - 518 - 532 ET 531 DU DEPARTEMENT DE L'ISERE (ITINERAIRE VALENCE-GRENOBLE), SUR UNE LONGUEUR DE 33,8 KM, POUR UN TONNAGE DE 140000 TONNES DE GRAVE-CIMENT. L'ARTICLE COMMENTE LES RESULTATS DE L'ETUDE DES FORMULATIONS EN LABORATOIRE, DES ESSAIS ET CONSTATATIONS EN COURS DE FABRICATION ET DE LA MISE EN OEUVRE DE LA GRAVE-CIMENT A PRISE RETARDEE. AU TERME DE L'ETUDE, LE DOSAGE DE 4,3 % DE CIMENT A ETE ADOPTE, AINSI QUE LE RETARDATEUR A RAISON DE 1,1 % PAR RAPPORT AU POIDS DE CIMENT. LA FABRICATION N'A POSE AUCUN PROBLEME PARTICULIER. POUR LA MISE EN OEUVRE, LE REPANDAGE A LA NIVELEUSE PAR DEMI-CHAUSSEE A PERMIS UNE CIRCULATION ASSEZ FLUIDE. LE PROCESSUS DE MISE EN OEUVRE ADOPTE (PREMIER REGALAGE - COMPACTAGE - DEUXIEME REGALAGE - COMPACTAGE DEFINITIF) A EVITE L'OPERATION DE FIN REGLAGE PAR RACLAGE OU APPORT DE GRAVE-CIMENT. L'EXECUTION DE L'ENDUIT DE PROTECTION A EU LIEU TOUJOURS AVANT L'ADMISSION DE LA CIRCULATION. LA COUCHE DE GRAVE-CIMENT SOIGNEUSEMENT COMPACTEE ET PROTEGEE PAR SON ENDUIT DE CURE S'EST TRES BIEN COMPORTEE DU FAIT DE SA RIGIDIFACTION ASSEZ RAPIDE. SIX PLANCHES D'ESSAIS DE 300 M DE LONGUEUR FONT L'OBJET D'UN SUIVI A LONG TERME (A).

  • Availability:
  • Authors:
    • CASTAN, M
    • GERBOD, A
    • SOMBARDIER, D
    • VEYSSET, J
  • Publication Date: 1978-11

Language

  • French

Media Info

Subject/Index Terms

Filing Info

  • Accession Number: 01295374
  • Record Type: Publication
  • Source Agency: Institut Francais des Sciences et Technologies des Transports, de l'Aménagement et des Réseaux (IFSTTAR)
  • Files: ITRD
  • Created Date: Nov 21 2010 5:00AM